This paper, based on a hydrological work and water resource survey, systematically analyzes the underground water resources, single-hole output and minable quantity in Jinyang hydraulic power plant by means of excavating single-hole pumping testing, gives a brief introduction to installation, pumping process, and data processing of single-hole pumping testing from a case study, and presents some points on which shall be paid attention.